Virtual commissioning

Test the machine before it reaches site

PLC code, drives, robot logic and machine sequences tested against a digital model before physical commissioning.

The challenge

Site commissioning is an expensive place to discover sequence errors, incorrect interlocks or unclear recovery logic. Every change competes with installation work, production deadlines and limited access to the machine.

JJA Group uses virtual commissioning to test control logic against a digital model earlier. We agree the test cases, connect the PLC and drive logic, resolve issues and document the results before anything reaches site.

What we do

  • Digital model setup for machines, cells and production lines
  • PLC code emulation and testing against simulated field devices
  • Drive, servo and motion sequence verification
  • Robot and machine logic integration testing
  • Interlock, fault recovery, alarm and operating-mode testing
  • Test protocols, issue registers and documented acceptance criteria

Industries

Machine builders

Prove sequences and interfaces before assembly or shipment.

Manufacturing

Reduce downtime and site changes during upgrades and new line integration.

System integrators

Add structured controls testing to your delivery and FAT process.

How we work

  1. 01

    Enquiry

    Tell us about your plant, system and what you need.

  2. 02

    First call

    We talk through the scope, constraints and timeline.

  3. 03

    Proposal

    You receive a clear proposal with scope and approach.

  4. 04

    Delivery

    We engineer, commission and document the work.

Frequently asked questions

What is virtual commissioning?+

It is the testing of PLC code, drives and machine logic against a digital model of the machine before the physical system is available. It helps identify controls issues earlier.

Can you test existing PLC code?+

Yes. We review the existing project, agree representative operating scenarios and test the logic against the digital model.

Does virtual commissioning replace FAT or SAT?+

No. It reduces risk before FAT and SAT by resolving controls issues earlier. Physical testing and site acceptance remain essential.

Can you include drives and robot logic?+

Yes. The scope can include drive and motion sequences, robot interfaces and the handshakes between machine systems.

What do we receive at the end?+

Agreed test protocols, an issue register, documented results and a controls package ready for the next project stage.

Want to test before site commissioning?

Tell us about your project and we will respond within one working day.

Request a quote